Barrière piétonsMarches entrée piscine
April 2021 : Stair and floor repair at the pool entrance
The contractor COLAS has achieved the repair of the lower stair at the pool entrance (Click on the pictures to enlarge).
Barrière piétons
April 2021 : Installation of a barrier for pedestrians at the gate
The contractor COLAS has achieved the installation of barrier to guide the pedestrians toward the dedicated gate (Click on the pictures to enlarge).
Plateforme stationnement motos
April 2021 : Arrangement of a parking area for motorcycles
The contractor COLAS has achieved the parking area for the motocycles next to the lower garage entrance (Click on the pictures to enlarge).
Elagage 2021Elagage 2021Elagage 2021
March 2021 : Trees pruning Week # 12
The contractor ROUX has achieved spring trees pruning and pruning of fences that cannot be carried out by our caretaker (Click on the pictures to enlarge).
Travaux sur boiseries Bat D
October 2020 : Refurbishing of outside woodworks of block D
Le company DUCHOSAL is again on our site from the middle of week 42, after being chased. Two workers have been tasked to complete the refurbishing of woodworks of east facade of block D. These works, which could not be completed in 2019 were supposed to resume during last spring.
 










November 2020 : Refurbishing of outside woodworks of block D now completed
Refurbishing of outside woodworks of block D was completed & accepted on November 13th, with 2 remaining balustrades to be replaced ...
2020 : Replacement of electrical powers supply meters by "Linky" connected meters
 
Works have started but are delayed because of Covid
June 2020 : Painting works in the corridor of block B (car park side)
 
A few pictures of Block B corridor (car park side) with mini wooden skis fastened on ski room door...
MISCELLANEOUS WORKS
Everyday life 
Photo galery 
News & Messages 
Resident's voice 
Co-ownership council 
Works / Expenditures 
General Meetings 
Choisissez votre langue
Select your language
Welcome to Les Glieres