May 2021 : Roof extension above entry to upper garages
The roof extension is now completed. That moddification seems efficient toward rain ingress as shown during July heavy rains. (Click on the pictures to enlarge).
May 2021 : Repair of door giving access to upper floors of block C
The resolution presented during 2022 General Meeting having not recieved sufficient numbers of votes despite the majority. It has been necesseary to fix damages to existing door. A reinforced hinge has been put in place along the height of the door. (Click on the pictures to enlarge).
April 2021 : Stair and floor repair at the pool entrance
The contractor COLAS has achieved the repair of the lower stair at the pool entrance (Click on the pictures to enlarge).
April 2021 : Installation of a barrier for pedestrians at the gate
The contractor COLAS has achieved the installation of barrier to guide the pedestrians toward the dedicated gate (Click on the pictures to enlarge).
April 2021 : Arrangement of a parking area for motorcycles
The contractor COLAS has achieved the parking area for the motocycles next to the lower garage entrance (Click on the pictures to enlarge).
March 2021 : Trees pruning Week # 12
The contractor ROUX has achieved spring trees pruning and pruning of fences that cannot be carried out by our caretaker (Click on the pictures to enlarge).
October 2020 : Refurbishing of outside woodworks of block D
Le company DUCHOSAL is again on our site from the middle of week 42, after being chased. Two workers have been tasked to complete the refurbishing of woodworks of east facade of block D. These works, which could not be completed in 2019 were supposed to resume during last spring.
November 2020 : Refurbishing of outside woodworks of block D now completed
Refurbishing of outside woodworks of block D was completed & accepted on November 13th, with 2 remaining balustrades to be replaced ...